 |
Streetscape Design
Bloomington, Illinois
Downtown Strategic Plan Project
Included preparation of illustrative plans and sketches to
illustrate streetscape facade and circulation/parking for
the downtown
Carol Stream, Illinois
Gary Avenue Image Enhancement Program
Prepared concept plan
for overall corridor enhancement; prepared construction documents
and specifications for public bid package and were retained
to provide project construction, observation and supervision
North Avenue Landscape Improvement Project
Prepared overall
design concept for 4.1 miles of North Avenue; construction
documents were prepared and IDOT permits obtained for the
implementation of design work; Camiros was retained to provide
construction observation and supervision
Chicago, Illinois
Retail Development Guidelines
Design guidelines for evaluating
land use, siting, parking and visual character of new commercial
developments
95th Street Facade and Streetscape Guidelines
Character-based
public and private sector design criteria for commercial development/redevelopment
South Loop Marketplace Streetscape Design
Preparation of a
streetscape design to enhance the impact of a major new retail
development on Chicagos near south side, preparation
of construction documents and inspection services
Portage Park
Business District Improvement Plan
Mount Greenwood
111th Street/Kedzie Avenue Business District
Improvement Plan
Jefferson Park
Business District Improvement Plan
Grayslake, Illinois
Downtown Design Program
Preparation of a downtown design package including design
development materials, specifying the layout of improvements,
materials and construction methods
Tinley Park, Illinois
Downtown Design Program
Development of streetscape enhancement
projects including new town square at Metra station area,
parking lot reconfigurations and beautification, and comprehensive
landscape enhancments
West Dundee, Illinois
Downtown Design Program
Preparation of an overall concept
for streetscape improvements on Main Street (Route 72) construction
plans/construction documents that allowed the streetscape
work to be bid in coordination with IDOTs Route 72 road
reconstruction project
|